Products

Products

Factory direct wholesale plastic gear rack high performance plastic gear rack

Home ProductsCNC MachiningMachined gear rack

Machined gear rack

  • Factory direct wholesale plastic gear rack high performance plastic gear rack
  • Factory direct wholesale plastic gear rack high performance plastic gear rack
  • Factory direct wholesale plastic gear rack high performance plastic gear rack
向上
向下

Factory direct wholesale plastic gear rack high performance plastic gear rack

  • Shape: Rack Gear

  • Material: Custom, ABS, PP, PC, PS, NYLON

  • Colour: Red, yellow, blue, black, white

  • Size: OEM

  • Delivery time: 15-30 Days

  • Product description:

    Factory direct wholesale plastic gear rack high performance plastic gear rack

Related Products:

Similar items

read more

  • Details

Factory direct wholesale plastic gear rack high performance plastic gear rack

 

Features:

1. Plastic rack gears material:Nylon, POM, UHMWPE

2. We manufacture plastic parts according to customers\' designs;

3. We can offer material certification,test report and relate surface-treatment report;

4. Plastic rack gears process:CNC machining,Milling,Drilling,Turning;

5. Products shown on the website are OEM;

6. Customized designs are welcome;

7. Plastic rack gears OEM/ODM orders are welcome.

 

 

We can provide:
Assistance from first idea through prototype
Quick delivery of prototypes or production needs
Design assistance and parts consolidation
In-house mold design (Insert, polyurethane, urethane molding)
In-house formulations to provide the best possible urethane for your application
Low-cost tooling
Over many years of in-house experience

 

 

 

Product name

Manufacturer Custom Wholesale Modulus Gear Rack

Material

plastic and rubber, the detailed materials as your need like

Plastic: POM/PA/Nylon/PC/PMMA /PVC/PU/Acrylic/ABS/PTFE/PEEK etc

Color

custom

Drawing Accepted

Stp,Step,Igs,Xt,AutoCAD(DXF,DWG), PDF,or Samples

Lead Time

-55~+250℃

Feature

High load bearing capacity
Easy to machine and install
Good chemical resistance
Ideal for use in water or sea water
Long service life
Generally less wear than metallic bearing materials

Packing

Export carton; pallet bag; or as client\'s request

Sample

Available, freight cost will be paid by clients.

Lead time

According to the quantity; Usually within 15days

Industrial Use

industrial engineering

Payment

Usually 30% T/T, 70% paid before shipment, VIA Credit card,visa card

 

For CNC machining, the products will be sent for 3 days. And we support OEM and ODM.

CNC加工

H1940c88a4fb041f58ec7170c78fa6125C

H8ed6e2d6602e443cbfe5b08083702471p

Technical Support: Magic Lamp