
plastic injection mould gear
Machined gear
                
                            
                            
                            
                            
                            
	Module: 0.25 and above
Certificate: ISO9001:2008; SGS report; Match environmental protection request
Tolerance: +/-0.05mm or as you request
Service: Customized designing, tooling, manufacturing, assembling
Lead time: Normallly 20 days for tooling and 5 days for production
Package: With polybag in carton
Material: POM, Nylon, PA+GF, TPE, ABS, PPS, PBT, TPU, PMMA, PE, PP, TPR, TPV, ETC. 
	













 
	
Email: [email protected]